Commercial

St. Phillips Norris Building Renovations

Project Overview

Renovation of the existing Norris Technical building on the St. Philips Campus . Elevated slab on piers for foundation at new addition with SOMD for levels 2-4. The crawlspace for the existing building was excavated and a new mud slab was placed. 

Structure type
Commercial
Location
San Antonio, TX
Completion date
2020-09-01

Areas of the crawlspace and the elevator pits were required to be excavated by hand due to restricted space and tight clearances. 

START LAYING THE GROUNDWORK.

Contact us and let’s start forming a solid relationship. Contact Us

Subscribe


© T&D Moravits. All Rights Reserved. Powered by Texas Creative. | Admin Login

X