
Commercial
St. Phillips Norris Building Renovations
Project Overview
Renovation of the existing Norris Technical building on the St. Philips Campus . Elevated slab on piers for foundation at new addition with SOMD for levels 2-4. The crawlspace for the existing building was excavated and a new mud slab was placed.
Structure type
CommercialLocation
San Antonio, TX
Completion date
2020-09-01Areas of the crawlspace and the elevator pits were required to be excavated by hand due to restricted space and tight clearances.