
Commercial
St. Phillips Norris Building Renovations
Project Overview
Renovation of the existing Norris Technical building on the St. Philips Campus . Elevated slab on piers for foundation at new addition with SOMD for levels 2-4. The crawlspace for the existing building was excavated and a new mud slab was placed.
Structure type
CommercialLocation
San Antonio, TX
Completion date
Areas of the crawlspace and the elevator pits were required to be excavated by hand due to restricted space and tight clearances.